General precautions
⚠️ Safety – Installation and maintenance
ATTENTION :
This equipment must be installed, adjusted and maintained exclusively by personnel qualified in industrial electricity, trained in safety rules and familiar with the design, operation and risks associated with this type of equipment.
Failure to comply with these instructions may result in significant property damage, serious injury, or even death.
⚠️ Intervention after power outage
WARNING :
After switching off, wait a minimum of five (5) minutes before any intervention (maintenance, inspection or control).
This delay is necessary to allow for the complete discharge of electrical components and to eliminate any risk of electric shock.
⚠️ Safety devices and grounding
Grounding devices, switching devices, electrical protections and associated safety equipment are the responsibility of the installer or operator.
These items are not supplied by SEAT Ventilation , unless specifically stated in the commercial offer.
Electrical characteristics
Power supply:
230 V – three-phase

400 V – three-phase
